Up Photo Album » Construction April 2009 Slideshow

Additional playground fence
Board and Batten east side of Church
Board and Batten on the South side of the Church
Church Nave north door box
Ductwork Vent
East view of Church Nave
Gathering space
Geothermal manifold and lines
Heating ducts in the Church Nave
Looking from Winchester
Looking south from the cloister
New railings on east emergency exit
North entrance of upper Gathering area
Organ lofts
Parging ICF walls
Railing for the lower level east
South entrance
South parking lot entrance
South side of Church Nave
South View of Church Nave
South wall of Church Nave with board
Sprinkler Manifold
The Cloister bulk head
The Cloister

Total images: 24 | Last update: 26/04/09 6:18 PM | Made with JAlbum & Chameleon | Help